Ramada Inn (Revelstoke, BC)


Project Details

Size: 85 rooms; four storey hotel – 53,393 sq ft

Modules: 64 modules

Timeline: Manufacturing start Q4 2016; installation Q2 2017


Overview

The project included: the design, manufacture, transport, set and install of a four storey 53,393 sq ft hotel in Revelstoke, British Columbia. The structure is an 85-room hotel featuring whirlpool bathtubs and kitchenettes. The hotel will also house an indoor swimming pool, waterslide, hot tub and eating bar.

This complete turn-key project was awarded to Horizon North in September 2016, the land was transferred to the client in October 2016 and an occupancy date of spring 2017 was agreed upon within the contract. The site foundation was installed over eight days in October 2016, with the modules being built simultaneously at our manufacturing facility in Kamloops, British Columbia. 

The craning of the modules onto the foundation is set for the first quarter of 2017 and will be completed over an anticipated 10 day period. The completion team will then take over and fully integrate each module, completing the final phase of the project in 2.5 months.


Related Posts:

Spotlight: Ramada Inn

In the Press: Ramada Inn

Press Release: Coast Hotels

In the Press: Coast Hotels

Modular Hotel Construction


Sourced from:

https://www.youtube.com/watch?v=8ubDNy4PS3Y

http://www.horizonnorth.ca/news-and-knowledge-centre/projects/hotel-project/


External Link: 

http://www.horizonnorth.ca/

https://www.youtube.com/


Copyright © 2023 · TechCanada · Log in